Detail Tugas Akhir

PERENCAANAAN ULANG TATA LETAK MENGGUNAKAN METODE SLP (SYSTEMATIC LAYOUT PLANNING) DAN CRAFT (COMPUTERIZED RELATIVE ALLOCATION OF FACILITIES TECHNIQUES) PADA PABRIK PLYWOOD TUNAS SUBUR PACITAN

Darsini, Darsini (2022) PERENCAANAAN ULANG TATA LETAK MENGGUNAKAN METODE SLP (SYSTEMATIC LAYOUT PLANNING) DAN CRAFT (COMPUTERIZED RELATIVE ALLOCATION OF FACILITIES TECHNIQUES) PADA PABRIK PLYWOOD TUNAS SUBUR PACITAN. Skripsi (S1) thesis, Universitas Muhammadiyah Ponorogo.

Berkas Tugas Akhir

[thumbnail of surat persetujuan unggah karya ilmiah darsini.pdf]
Text
surat persetujuan unggah karya ilmiah darsini.pdf
File Pdf (321kB)
[thumbnail of HALAMAN DEPAN.pdf]
Text
HALAMAN DEPAN.pdf
File Pdf (731kB)
[thumbnail of BAB 1.pdf]
Text
BAB 1.pdf
File Pdf (138kB)
[thumbnail of BAB 2.pdf]
Text
BAB 2.pdf
Restricted to Registered users only
File Pdf (460kB)
[thumbnail of BAB 3.pdf]
Text
BAB 3.pdf
Restricted to Registered users only
File Pdf (298kB)
[thumbnail of BAB 4.pdf]
Text
BAB 4.pdf
Restricted to Registered users only
File Pdf (1MB)
[thumbnail of BAB 5.pdf]
Text
BAB 5.pdf
Restricted to Registered users only
File Pdf (71kB)
[thumbnail of LAMPIRAN.pdf]
Text
LAMPIRAN.pdf
File Pdf (2MB)
[thumbnail of DAFTAR PUSTAKA.pdf]
Text
DAFTAR PUSTAKA.pdf
File Pdf (187kB)
[thumbnail of SKRIPSI FULL TEXT.pdf]
Text
SKRIPSI FULL TEXT.pdf
Restricted to Registered users only
File Pdf (4MB)

Abstract

This study aims to provide a re-planning of the factory layout using the SLP (Systematic Layout Planning) and CRAFT (Computerized Relative Allocation of Facilities Techniques) methods. This research is a descriptive survey research where data is collected by interviewing those who understand the whole process and the required data. The results of the layout design using the CRAFT method have a total displacement moment of 3,388,270 meters/month, the total material handling cost is RP. 29,071,357,-/month, and has an irregular flow type, while SLP has a total displacement moment of 3,093,558 meters/month, the total material handling cost is Rp. 26,542,728,-/month, and has an irregular flow type. Therefore, the proposed layout that can be used as a re-planning at the Tunas Subur Pacitan Plywood Factory is the proposed layout of the SLP (Systematic Layout Planning).

Informasi Item

Item Type Thesis (Skripsi (S1))
Uncontrolled Keywords Plann Layout, CRAFT (Computerized Relative Allocation of Facilities Techniques), and SLP (Systematic Layout Planning).
Subjects H Social Sciences > HB Economic Theory
Divisions Faculty of Economic > Department of Management
Depositing User fe . userfe
Date Deposited 11 Aug 2022 02:26
Last Modified 11 Aug 2022 02:26
URI https://eprints.umpo.ac.id/id/eprint/9389

Actions (login required)

View Item
View Item
Ada yang bisa kami bantu?